EVERGREEN ENTERPRISES
My Jobs
These are some of the jobs I have done over the years. This is only a few of the thousands I have done in my career.
Clarion Hotel
Colorado Springs
The Claroin Hotel is in downtown Colorado Springs, Colorado at 314 West Bijou.
Being a hotel it is open to the public so one could see the quality of my work first hand.
I was hired to do all tile work within the entire hotel. The project took six weeks to complete.
I utilized three assistants on this project. We finished on time and on budget.
Clarion Floor Prep
​
The Clarion provided yet another opportunity for Evergreen Enterprises to shine. The lobby floor under its new configuration had three different concrete pours, one being a ramp into the bulding previously outside. It was crumbling and broken and had to berepaired before the stone flooring was installed. There were also several expansion joints across the lobby than nobody thoughtb would ever be flat. After days of tearout and hard workn we had a semi smooth floor that needed several hunddred pounds of leveler, the deepest being 2.5 inches. We impressed everyone by getting the entire floor flat with only a .5 inch variation of floor height difference across the entire lobby and back hall, about 60 - 70 ft!
The Fireplace
​
The Clarion lobby has a unique feature, a grand fireplace with a water feature in the center. Beautiful, but a challenge. Slate of varying thickness was to cover the entire thing from floor to ceiling, fifteen feet high. Paitence and experience paid off. As the center piece of the lobby it needed to be impressive! The hotel got what they asked for and then some, it turned out beyond expectations and got rave reviews from passers-by. It is still operating 7 years later and still looks great!
Final Finish
​After 6 weeks on the job everything was complete and it was time to move on but not before photos of the finished product. The job was achallenge to be certain but the crew and I overcame all obsticals and everyone was pleased